A colleague opens a repair file after a handoff. There are several estimates, a folder of photos, and an email saying āapproved.ā What was approved, which version applied, and what remained unresolved?
A decision record should answer those questions without requiring the original reviewer to reconstruct the conversation. This is one practical way to reduce claim costs associated with duplicated review and avoidable rework.
Identify The Decision
Write a short description of the question being resolved. Refer to the repair location and the relevant estimate version. āApprove revised estimateā is less useful than a note identifying the specific scope or price change under review.
Keep requests, recommendations, and approvals distinct. Someone submitting a proposal is not the same as someone authorized to approve it. Use the organizationās established authority and review requirements.
Link The Evidence
Connect the decision to the documents actually considered: the proposal, relevant photographs, inspection notes, and clarification responses. Label versions and dates consistently so a later reader can distinguish supporting evidence from superseded material.
The NAICās claims overview describes documentation as part of the loss assessment process. A well-organized repair file makes that supporting information easier to relate to individual decisions.
Record The Reason
Summarize the reasoning in plain language. Explain which difference was resolved, which assumption changed, or why an alternative was accepted. A short, specific explanation is more helpful than a long collection of pasted messages.
For example: āThe revised quantity follows the measurement recorded during the second inspection; the earlier estimate used a preliminary quantity.ā That tells the next reviewer what changed and where to look without making them infer the explanation from the totals.
Keep Status Clear
Record the decision-maker, decision date, and the applicable status. Note whether an item is pending information, under review, approved under the relevant authority, or returned for clarification. Track any conditions or follow-up actions separately.
Do not let a closed task imply that every part of the claim is resolved. A completed pricing review can coexist with other open work. Make the boundaries visible.
Prepare The Handoff
Before transferring responsibility, leave a brief summary of the current position, outstanding questions, and next action. Share relevant information through approved channels with the people who need it; a comprehensive file does not require broad access to unrelated personal information.
- What question was decided?
- Which proposal and evidence supported it?
- What was the reason?
- Who made the decision and when?
- What still needs attention?
A clear record supports continuity and review. It does not replace coverage analysis, professional assessment, or the organizationās retention and claims-handling requirements.
Reduce Avoidable Costs
Explore BidCraft for insurance carriers to see how clearer scope, comparable bids, and documented decisions support repair cost control. Discuss your workflow with our team to assess fit, responsibilities, and onboarding requirements before account setup.
